Diagnose before replacing

Ask for the condition of the covering, deck, flashing, ventilation, drainage, and areas of water entry to be described.

Use a common scope

Ask each bidder for the same surfaces, layers, materials, accessories, protection, and disposal methods.

Control the unknowns

The contract should explain possible additional work, its approval, price, schedule, insurance, and warranties.

  • Licence and liability insurance
  • Site protection and cleanup
  • Deck repairs
  • Ventilation and flashing
  • Manufacturer and labour warranty

Frequently asked questions

Useful questions before deciding

Is a price per square foot enough?

No. Removal layers, slope, access, deck condition, details, and materials affect the actual scope.

How should hidden damage be handled?

The contract should state how damage will be documented, priced, and approved before additional work proceeds.

Official sources