Use an order of priority
Start with safety and protection of the building. Then address system reliability and comfort, followed by improvements that are mainly cosmetic.
Find the dependencies
A finish should not conceal moisture, electrical, or structural problems. Diagnose the cause and sequence the work before closing surfaces.
- Safety and compliance
- Water, drainage, and envelope
- Structure and systems
- Efficiency and comfort
- Finish and appearance
Calculate the full cost
Add design, permits, taxes, preparation, site protection, contingency, and possible temporary accommodation. Ask for quotes with comparable scopes.
Check the approvals
Requirements vary by municipality, building type, condominium rules, and heritage status. Verify them before signing contracts or ordering materials.
Frequently asked questions
Useful questions before deciding
How much contingency should I keep?
It depends on project scope and uncertainty. Clarify exclusions and set a suitable reserve before work begins.
Does every project require a permit?
No, but rules vary. Check with the municipality and, where relevant, the condominium or heritage authorities.